33 kV Transmission Line from P/S/S Sikidri

Supply, erection, testing and commissioning of an 8.5 km 33 kV incoming line feeding the food park's substation.

Contract value
₹3.96 crore
Work order
JMFPPL/ELE/0413/01
Location
Sikidri to Getalsud, Ranchi

The incoming feed for the Jharkhand Mega Food Park campus: approximately 8.5 km of 33 kV line run from the Sikidri power substation to the park’s own 33/11 kV substation at Getalsud.

The work was executed under the supervision of the Jharkhand State Electricity Board, which issued its completion certificate vide letter no. 954 dated 21.09.2013. The client subsequently confirmed in writing that the work was completed within the stipulated timeframe and to their entire satisfaction.

360° · Multi-Angle Inspection

Site Records & Multi-Angle Exploration

Documented project photography from engineering survey through completion.

2 Viewpoints on Record
High-voltage 33 kV express transmission towers and conductor spans across plateau landscape
Angle 01 / 02

33 kV Express transmission line from Sikidri Hydel Power Station to Getalsud Mega Food Park.

Full Screen
Steel transmission gantry against skyline for Sikidri 33 kV express line
Angle 02 / 02

Intake terminal gantry connecting Sikidri feeder circuit.

Full Screen

Individual Frame Inspection (2 captures)

  • High-voltage 33 kV express transmission towers and conductor spans across plateau landscape

    33 kV Express transmission line from Sikidri Hydel Power Station to Getalsud Mega Food Park.

  • Steel transmission gantry against skyline for Sikidri 33 kV express line

    Intake terminal gantry connecting Sikidri feeder circuit.

Completion certificate

Issued by Jharkhand Mega Food Park Pvt. Ltd. on completion. Published in full — read it before you take our word for anything on this page.

Completion letter from Jharkhand Mega Food Park for the 33 kV line from SikidriRead

Jharkhand Mega Food Park Pvt. Ltd.

Completion Letter — 33 kV Line

8.5 km 33 kV line from Sikidri, ₹3,96,04,909. JSEB completion certificate issued vide letter 954 of 21.09.2013.

Download PDF

8.5 km, structure by structure

How a 33 kV line gets from survey to charged

Overhead line and lighting along the corridor at dusk
  1. Survey

    Alignment walked and pegged, way-leave settled, and foundation pits opened at every structure position.

  2. Erection

    Structures raised and grouted, cross-arms fitted, and pin and disc insulators mounted.

  3. Stringing

    Conductor run out span by span, then pulled to the specified sag and clamped in.

  4. Charging

    Earthing checked, insulation tested, and the line charged under the utility’s supervision.

Photographed on site

  • Overhead line and lighting along the corridor at dusk
  • Conductor and cable drums delivered to site

More like this

Related projects

Other contracts drawing on the same disciplines.

Siramtoli-Mecon cable-stayed flyover over Ranchi railway tracks illuminated at night with tricolor lightingSite photograph
EPC principal

Electrical Utility Shifting, Mecon Roundabout Flyover

Larsen & Toubro Limited

Electrical utility works for L&T's Mecon Roundabout Flyover in Ranchi, certified complete by the project manager with quality recorded as good.

Contract value
₹7.14 cr
Work order reference
LE/LE22M630/WOD/23/000043
High-voltage 33 kV power transmission line corridor across industrial landscapeSite photograph
Private

33 kV Line on 13 m Rail Poles, Dakra Coal Washery

Monnet Daniels Coal Washeries Pvt. Ltd.

Supply and erection of a 33 kV line on 13 m rail poles serving a coal washery installation.

Contract value
₹2.1 cr
Work order reference
PRJ/MDCWL/WO/25/07
Industrial steel plant high-voltage power transmission corridor at BokaroSite photograph
Private

11 kV DVC Transmission Line on Rail Poles

Electrosteel Castings Ltd.

11 kV DVC line on rail poles, completed to the client's satisfaction within the scheduled programme.

Contract value
₹2 cr
Work order reference
6000025281/11-12

Planning something similar?

Send us the tender or the drawings. We will come back with a scope, a programme and a budget — and the completion certificates to back it.