Substation buildings, warehouses, administrative blocks, dormitories, foundations, piling and roads — delivered alongside the electrical scope.

Ranisons is registered for civil construction as well as electrical work, and holds a plant fleet to match — which is why our substation and building packages are delivered whole rather than split between trades.

Our largest civil package to date is the ₹493 lakh warehouse, administrative block and dormitory contract for Jharkhand Mega Food Park at Getalsud, delivered complete with internal electrical and sanitary installations. We also built the ₹90 lakh civil works for the same client’s 33/11 kV, 2×5 MVA substation, and the substation building for the Monnet Daniels coal washery at Dakra.

Method

How we deliver

  1. 01

    Design & drawings

    Structural design, foundation detail drawings and bar bending schedules.

  2. 02

    Site preparation

    Levelling, excavation and setting out.

  3. 03

    Substructure

    Foundations, piling where required, plinth and underground services.

  4. 04

    Superstructure

    RCC frame or steel structure, masonry, roofing and finishes.

  5. 05

    Services & handover

    Internal electrical and sanitary installation, testing and handover.

Questions

Frequently asked

Why take civil and electrical from one contractor?

It removes the interface risk that normally sits between the two trades. On our substation packages the foundations were set to equipment we were ourselves installing, and the buildings handed over with their services live.

What is your largest civil package?

Two warehouses, an administrative building and a seven-room dormitory for Jharkhand Mega Food Park at Getalsud, at ₹493 lakh, including all internal electrical and sanitary works.

What plant do you operate?

Owned: hydra crane, tower crane, vibratory rollers, concrete pump, weight batcher, compactor, DG set, water tankers and bar cutting machines. Through associates: excavators, JCB, tippers and a D4 dozer.

360° · Multi-Angle Inspection

On site execution records

RCC transformer plinths, control buildings, switchyard blast walls, and warehouse structures.

4 Viewpoints on Record
Heavy reinforced concrete transformer plinth with gravel soak pit
Angle 01 / 04

RCC transformer plinth with blast wall separation and oil containment pit.

Full Screen
Substation bay civil wall and security compound fence
Angle 02 / 04

Substation boundary security wall, equipment foundations and yard drainage.

Full Screen
Substation control building interior with cable trenches
Angle 03 / 04

Control room civil structure with recessed cable trenches and anti-static flooring.

Full Screen
Finished civil structure ready for switchgear installation
Angle 04 / 04

Pre-engineered warehouse and switchgear hall construction.

Full Screen

Individual Frame Inspection (4 captures)

  • Heavy reinforced concrete transformer plinth with gravel soak pit

    RCC transformer plinth with blast wall separation and oil containment pit.

  • Substation bay civil wall and security compound fence

    Substation boundary security wall, equipment foundations and yard drainage.

  • Substation control building interior with cable trenches

    Control room civil structure with recessed cable trenches and anti-static flooring.

  • Finished civil structure ready for switchgear installation

    Pre-engineered warehouse and switchgear hall construction.